Lithia Springs Data Center
- Lithia Springs, Georgia
- Completed 2023
- 44 Acres
Home / Single Project
Project Overview
Site Development & Mass Grading
The Lithia Springs Data Center project involved full-site development across 44 acres in Douglas County, Georgia. Cold Iron was brought in to handle all mass grading, earthwork, rock blasting, and underground utility installation — transforming raw, heavily wooded terrain into a mission-ready data center campus pad.
The site presented significant geological challenges, including substantial rock formations requiring controlled blasting operations. Our crew coordinated closely with the general contractor and civil engineers to maintain project schedule while managing blasting vibration impacts on adjacent properties. Storm drainage, water, and sanitary systems were installed concurrently with grading to keep the project on track.
Services Provided
What We Did
- Excavation
- Mass Grading
- Rock Blasting
- Utility Installation
- Storm Drainage
- Land Clearing
Project Scope
By The numbers
Project Photos
From the field
Project Details
Location
Lithia Springs, GA
Year
2023
Client Type
Commercial / GC
Acreage
44 AC
Earthwork
365,280 CY
Rock
31,450 CY
Blasting
40,200 CY
Storm Pipe
6,580 LF
Water Line
7,420 LF
Walls
18,640 SF
Project Location
Lithia Springs, Georgia
This project was completed in Douglas County, Georgia — one of the fastest-growing data center corridors in the Southeast. Cold Iron operates nationwide on mission critical and commercial projects, with crews deployable across the region.
- Lithia Springs, Douglas County, Georgia
- 44-Acre Mission Critical Campus
- Project Year: 2023