What We Did: A full suite of demolition services were deployed on this project.

  • Industrial Demolition
  • Steel Salvage
  • Debris Hauling
  • Site Clearing

Project Photos

From the field

Project Overview

Rockhouse Data Center

The [City] industrial facility project involved the full demolition of a 118,000 SF manufacturing building, including structural steel salvage and complete site clearing across 5.8 acres. Mako Services was contracted to take the structure from operational condition to a cleared, shovel-ready pad.

The size and steel-heavy construction of the facility required systematic deconstruction sequencing to safely salvage usable material before mechanical demo began. Our team coordinated debris hauling and salvage logistics simultaneously to keep the project moving. At closeout, 94 tons of structural steel had been recovered and the site was fully cleared.

Project Details

Service Type
Commercial

Location

Midwest

Year

2024

Client Type

Industrial / Owner
STRUCTURE SIZE:
118,000 SF
DEBRIS HAULED:
7,400 CY
STEEL SALVAGED:
94 Tons
SITE CLEARED:
5.8 Acres

Have a Similar Project?

Get a free estimate from Florida’s trusted General Contracting Crew.

Project Location

Lithia Springs, Georgia

This project was completed in Douglas County, Georgia — one of the fastest-growing data center corridors in the Southeast. Cold Iron operates nationwide on mission critical and commercial projects, with crews deployable across the region.

  • Lithia Springs, Douglas County, Georgia
  • 44-Acre Mission Critical Campus
  • Project Year: 2023

What Clients Say

Project Feedback

Related Projects

Each project tells a story of careful planning, skilled execution, and dependable service—completed on time and built to last.

Ready to start your project? Let’s Talk.

Request a free, no-obligation site assessment and estimate from Cold Iron’s veteran crew.